The Unilock pavers that have been sitting in my driveway for months got put to use today. The wall crew switched gears and compacted the final rough grade before jumping on the pavers. These are the Umbriano that require a little different install (No Poly sand). The PB also finished tile today around the spa. If all works our we will be swimming by Aug 1 :).
The only kink today was the wait for electrician for the deck bonding which is a grounding wire 4-6 inches below grade 18 inches from water line. It's throwing off the paving somewhat as the crew can't build the deck right up to the pool. That's getting installed Thurs morning with an inspection hopefully end of day.
Entry way to Pool
I think the crew is excited to get a break from building that wall
Final Tile Placed in Spa
My Daughter has Little Fun with the Paver Sand