Electric done - Wall continues

Electrical was 90% completed yesterday and we are awaiting a visit from the inspector before everything is backfilled. Gas is scheduled for Monday.


One note about gas. Our pool builder definitely takes a "throw it over the wall" approach for the gas component in terms of giving guidance. We have definitely had to be very proactive in figuring out where to dig the ditch, when to set up the call, etc. If I wasn't on top of the project, the gas install could have fallen through the cracks another few days.


POOL EQUIPMENT IS ON LEFT SIDE OF POOL


CLOSEUP OF EQUIPMENT WITH EASYTOUCH ELECTRIC
Filter, heater and polaris pump. Also had the crew use a Jandy spilt on the return going to the pool and put a cap on one side for a future waterfall. That's the pipe that is sticking straight out.

WALL IN PROGRESS PHOTO
The stone wall will go up to about 2 feet and meet the closer steps. There will then be another 2 foot wall on the right of the steps that separates the patio from the pool deck/walkway. Access to the pool deck will be from the far stairs.

For fencing, a black ornamental will go down the middle (between far wall and pool) and to completely sepearte the house from the pool area. When our kids get older, we will proably switch up the fence configuration.